Major Agro-chemical manufacturer sets up complete Automated plant in record 6 months ensuring faster time to market, high availability & consistent product quality for its New Export Oriented Unit at Dahej
Challenge
- Process being Hazardous the system is to be commissioned error/bug free in first trial “RFT”).
- Fool proof Logic to take care of any malfunction in the system to avoid Process run-away & Hazard situations.
- Remote location so limited availability of skilled man-power for operations & maintenance
- Faster time to market asking for production start up within 6 months from Project Kick off.
Solution
- Rockwell DCS offering Plant-wide Integrated Architecture
- Hazardous Field mounted remote IS I/O’s for reduction in field cabling & installation.
- Intelligent Architecture with enhanced field side diagnostics & Motor protections with IMCC
- Enhanced & User friendly operator interface
- Asset Management for securing, managing & tracking of assets
Result
- Production start-up within 6 months from Project Kick off.
- Consistent Batch quality ensuring high standards of product quality.
- Higher productivity to meet market demands resulting from flexible Control Logic and minimum downtime achieved due to enhanced diagnostics & ability to handle faults & exceptions
- 100% error free & easy operations achieved with Tight control & User friendly Operator interface
- Lower total cost of ownership due to Plant-wide integrated architecture